NBN S 21-100-1:2025 · BELAC ISO 17020
Fire detection inspection
Acceptance of a new system, then periodic inspection at least every three years under the standard. Whether a building needs detection depends on the texts that apply to it.
Fire detection systems are inspected under NBN S 21-100-1:2025, valid since 14 July 2025, which replaced the 2021 edition with no period of coexistence. Since 2025 that standard covers detection only: alarm systems fall under NBN S 21-112. Whether a building must have detection depends on the building and the texts that apply to it: there is no single rule.
The standard provides for an initial inspection of every new system, called acceptance, then a periodic inspection at least every three years (9.3 and 9.4). Each tests at least 20 % of the point detectors (9.2.4 and 9.2.5).
ⓘ Language of the report: the official report is issued in French or Dutch, as Belgian law requires. An English summary is available on request, free of charge.
Acceptance (new installation)
The initial inspection of a new system, once it has been placed and commissioned: at least 20 % of the point detectors, at least 20 % of the manual call points on each circuit and every fire scenario, up to the receipt of the control signal by the controlled systems, are tested (9.2.4). This is what lets you hand the building over with a compliant detection system.
Periodic inspection
At least every three years under the standard (9.4), by an accredited Type A inspection body, on a representative sample. Other texts set their own checks, for example for hospitals and workplaces.
Additional inspection after extension
An adaptation that changes how controlled equipment is triggered, the signalling or the surveillance level calls for a specific inspection within 12 months. Other adaptations are checked at the next periodic inspection (9.5).
Public premises & HORECA
Restaurants, shops, offices, schools, hotels, venues. Hotels are held to stricter requirements because people sleep on the premises.
Care homes & industry
Care homes, nurseries and higher-risk industrial sites. What is required depends on the building, the planning permit, the fire service and your insurer.
Maintenance and logbook
We also verify what you are required to do between our visits: the operator’s own daily, monthly and quarterly checks, and the annual preventive maintenance — the logbook is checked when we attend.
Emergency lighting alongside
A separate but complementary inspection (NBN EN 1838 / NBN EN 50172, General Regulation for Occupational Protection), carried out outside the scope of our BELAC accreditation. We carry out both — ask for a combined visit.
Transparent pricing
Prices include VAT, no surprises. Personalised quote within 24h.
Re-inspection: this rate applies within one month of our inspection. After that, the new visit is a full inspection at the full rate.
✅ What's included
- ▸ Functional test of the detectors and the alarm devices
- ▸ Verification of the control panel and the zones
- ▸ Check of the batteries and the backup power supply
- ▸ Verification of alarm transmission
- ▸ Review of the documentation (logbook, as-built plans)
- ▸ Check of the operator’s own periodic verifications
- ▸ Verification of the annual preventive maintenance record
- ▸ Official report compliant with NBN S 21-100-1:2025
- ▸ Findings listed with what has to be corrected, and by when
⚖️ Legal framework
- ▸ NBN S 21-100-1:2025 — Fire detection systems (in force since 14 July 2025)
- ▸ NBN S 21-112 — Alarm systems (separated from detection in the 2025 edition)
- ▸ NBN EN 1838 / NBN EN 50172 — Emergency lighting (complementary inspection, outside the BELAC accreditation)
- ▸ General Regulation for Occupational Protection — employer’s obligations
- ▸ BELAC accreditation No. 663-INSP (ISO/IEC 17020) — covering the fire detection inspection
Atlas Contrôle ASBL is accredited by BELAC under No. 663-INSP (ISO/IEC 17020) for the initial and periodic inspection of fire detection systems (NBN S 21-100-1 and -2).
Frequently asked questions
Which standard applies to a fire detection inspection? ▾
What is the difference between acceptance and periodic inspection? ▾
How often does it have to be inspected? ▾
Which premises are concerned? ▾
Can the installer carry out the inspection? ▾
Does the emergency lighting need inspecting too? ▾
Do you cover the whole of Belgium? ▾